PROJECT NAME
Suffren Hotel Project at Port Louis

YEAR OF CONSTRUCTION
2004

ARCHITECT
Jean Francois Adam Architects

BUILDING CONTRACTOR
General Construction Co Ltd / Cogir JV

M & E ENGINEER
RPW Consultants Engineers

NATURE OF PROJECT
Hotel

SLP’S SCOPE OF WORKS

Electrical Installations Including: HV Substations

Power Transformers

Main LV Distribution Panels and Network

Scene Lighting Systems

Early Warning Addressable Fire Detection and Alarm System

Public Health Installations including: Pumping Stations

Hot and Cold Water Distribution Networks

Waste and Sewerage Collection Network

Fire Protection Installations.

PROJECT CHALLENGES

The Project itself was a Challenge to us and the Site Logistics on such a widespread Development involved Quad Bikes and Lorries for Effective Control of the Different Areas of the Project.

PROJECT FIGURES

3.6 MVA of Installed Electrical Power Supply

120 Km of Power Cables

Over 500 Km of Wiring installed

Over 50,000 Electrical Outlets Installed

800 Adressable Devices on the Fire Alarm Syste

20Km of Internal Plumbing and Piping

5 x 30 kW Cold Water Booster Sets on VSD’s

20 Sewerage Lifting Stations

40 Km Internal Plumbing and Piping

24 Km HDPE External Piping

25 km uPVC Drainage Piping Installed

Cart

No products in the cart.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare