PROJECT NAME
Movenpick Hotel

YEAR OF CONSTRUCTION
2005

ARCHITECT
Jean Francois Koenig Architects

BUILDING CONTRACTOR
Bhunjun & Sons Co Ltd

M&E ENGINEER
WSP Mauritius Ltd

NATURE OF PROJECT
Resort Hotel

SLP’S SCOPE OF WORKS

HV Substation

Power Transformers

Main LV Distribution Panels and network

Lighting Systems

UPS Network

Early Warning Addressable Fire Detection and Alarm System

 PROJECT CHALLENGES

Systems were Re-designed during Construction due to Project Alterations

3000 Light Fittings were Delivered Late and had to be Installed in 2 Weeks

Project was Fast Track

 PROJECT FIGURES

2 Mw of Installed Power

15Km of Power Cables installed

500Km of Electrical Wiring Installed

25,000 Electrical Connection Outlets Installed

600 Addressable Devices Installed on the Fire Alarm System

Cart

No products in the cart.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare