Electrical Installations Including: HV Substations
Power Transformers
Main LV Distribution Panels and Network
Scene Lighting Systems
Early Warning Addressable Fire Detection and Alarm System
Public Health Installations including: Pumping Stations
Hot and Cold Water Distribution Networks
Waste and Sewerage Collection Network
Fire Protection Installations.
PROJECT CHALLENGES
The Project itself was a Challenge to us and the Site Logistics on such a widespread Development involved Quad Bikes and Lorries for Effective Control of the Different Areas of the Project.
PROJECT FIGURES
3.6 MVA of Installed Electrical Power Supply
120 Km of Power Cables
Over 500 Km of Wiring installed
Over 50,000 Electrical Outlets Installed
800 Adressable Devices on the Fire Alarm System
20Km of Internal Plumbing and Piping
5 x 30 kW Cold Water Booster Sets on VSD’s
20 Sewerage Lifting Stations
40 Km Internal Plumbing and Piping
24 Km HDPE External Piping
25 km uPVC Drainage Piping Installed