PROJECT NAME
Club Med Hotel at Albion

YEAR OF CONSTRUCTION
2008

ARCHITECT
Jean Michel D’Unienville Architects

BUILDING CONTRACTOR
General Construction Co Ltd

M & E ENGINEER
ATEC

NATURE OF PROJECT
Hotel Resort

SLP’S SCOPE OF WORKS

Electrical Installations including:Standby Generator sets

HV Substation

Power Transformers

Main LV Distribution Panels and network

Lighting Systems

UPS Network

Lightning protection system

Early Warning addressable fire detection and alarm system.

Telephone and Data wiring systems.

Public Health Installations including: Pumping stations

Cold Water Distribution Network

Hot Water Storage and Distribution Network

Fire Protection Installations.

PROJECT CHALLENGES

Site Logistics involved in Working on a Widespread Development Incorporating 65,000 SqM of Gardens

PROJECT FIGURES

2.4 MVA of Installed Electrical Power Supply

20 Km of Power Cables20 Km of Power Cables

400 Km of Wiring Installed

12,000 Electrical Outlets Installed

400 Adressable Devices on the Fire Alarm System.

20Km of Internal Plumbing and Piping

15 Km of Pre-insulated PEX Pipes Installed

10Km of UPVC External Underground Piping Installed

10 Sewerage Lifting Stations.

Cart

No products in the cart.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare