Main LV Distribution Panels and network
Lighting Systems -UPS Network
Early Warning addressable fire detection and alarm system
Lightning Protection System
Building Management System
Public Health Services
Fire Protection Installations
Ventilation and Air Conditioning system
Data Center Electrical and Mechanical Installations
PROJECT CHALLENGES
Fast Track Project – six months
Installed and Commissioned Adaptive Control Lighting System and Sophisticated LON based BMS System
Form IV MLV Panel installed
PROJECT FIGURES
1 MW Electrical Power Supply
xx KM of Power Cables installed – xx KM